Markus Butkereit
Recently Works Information Contact
Der Monolith - Experiment No.06b
Der Monolith - Experiment No.06
Material/ 1 pillar, rain gutter, 8 intravenous bags, 8 fans, 2 l red pigment
Measures/ various
2016/ Berlin/ Germany
Set-up and Execution/
A pillar is installed in a room. Around the pillar, bout two-thirds of the way up, a rain gutter is attached. On both sides, two infusion bags filled with water are hung from the ceiling and drip into the rain gutters. On the floor, on each side of the pillar, two fans are set up, directed towards the pillar. The fans are turned on and the infusion bags’ roller clamps opened.
Supposition/
The rain gutter will overflow. The red-colored water runs down the pillar and at the height of the eight fans the pillar becomes colored red.
«««